Integrated Wastewater Process: Cutting Treatment Time by 66% and Boosting Efficiency

Discover BKT’s Integrated Wastewater Process—featuring Process 123 and the tomorrow water process (twp™)—offering fast, efficient, and sustainable treatment solutions for today’s challenges.

In today’s post, we introduce BKT’s Integrated Wastewater Process—a streamlined and well-balanced approach to modern wastewater treatment. Faced with rising energy costs, space constraints, and increasing demand for sustainable operations, traditional treatment methods often fall short. At BKT, we go beyond individual technologies to offer fully integrated solutions that are compact, efficient, and future-ready.

Why Integration Matters

Individual technologies can only go so far. A truly effective solution requires a well-organized and well-balanced process—one that combines innovation with practicality, and performance with sustainability.

That’s why BKT delivers integrated systems like Process 123 and the tomorrow water process (twp™)—solutions that are transforming wastewater treatment across the globe.

PROCESS 123

Accelerate Treatment. Amplify Impact.

Process 123 is a high-efficiency system based on our Proteus technology. It reduces primary treatment time by more than 66%, achieving key removal targets (BOD, SS, NH₄-N, and TN) in just 3 hours.
This makes Process 123 especially suitable for developing regions where space is limited and infrastructure development is urgent. Its compact design and fast deployment bring tomorrow’s wastewater treatment to where it’s needed most.

Process 1
Process 2
Process 3

tomorrow water process (twp™)

Integrated, Sustainable, and Scalable

twp™ is a fully integrated process that brings together four of BKT’s core technologies into a single, optimized treatment train:

  • Proteus – Enhances primary treatment and minimizes plant footprint
  • AMX – Enables energy-efficient nitrogen removal in the mainstream
  • AAD – Recovers energy from organic waste through advanced anaerobic digestion
  • DRACO – Achieves over 90% sludge volume reduction using high-efficiency HTC

Together, these technologies reduce treatment time from 6–10 hours to just 3 hours, while cutting energy consumption by more than 60%.
twp™ is a scalable, forward-looking solution for municipalities and industries aiming for carbon neutrality, circular economy, and resource recovery.

tomorrow water process (twp™)

At BKT, we believe that today’s challenges are tomorrow’s opportunities. Our integrated solutions like Process 123 and twp™ are helping cities and regions worldwide build resilient, energy-efficient, and sustainable water infrastructures.

Looking for a tailored wastewater solution?